Sam's Work Experience Blog

Thursday, July 13, 2006

Day 8

Finally. The 8th day. The day the Showreel was to be shown to the students. We just hoped everything would go to plan. Walking down to the Picture House, I ran into Steve and Ryd, and once we got there, Steve showed me to the projector room, from which evrything would be controlled. It was unbeliveable how much technical equipment you could fit into one room!

Pete very carefully made the point to all the students that we were using an £80,000 projector, and as the presentation began, we noticed that the £80,000 projector was cutting bits off the top of the scenes!

However, other than that, the entire thing went pretty much to plan, and the Staff Music Video was received very well by everyone. There was a surpise for Ryd though - the other Media staff had compiled a montage of his 'best bits' Big Brother style! So Ryd went up to the front to receive his surprise prize, and I laughed with everyone else, before Pete decided that he hadn't embarrassed enough people, so he called me and Josh, the other work experience student, to the front to receive a bag of sweets aswell!

As you can see, from the fact that a half-day entry has been longer than ALL the rest, it was a seriously eventful day!

0 Comments:

Post a Comment

<< Home